Background

Progetti a idrogeno

H2 Poseidon Pipeline

Connecting the hydrogen networks of Greece and Italy

IGI Poseidon is developing a dedicated hydrogen pipeline across the Ionian Sea. Designed from the outset to carry 100% hydrogen in either direction, H2 Poseidon would give producers in Greece a route to industrial customers in Italy and connect both markets to the emerging European hydrogen network.

  • arrow icon 370 km of planned pipeline
  • arrow icon 90 GWh/day of initial transport capacity, targeted for 2035
  • arrow icon 150 GWh/day of planned transport capacity from 2036

From Igoumenitsa to Taranto

The planned route crosses approximately 210 km of the Ionian Sea from the Igoumenitsa area in north-western Greece to Otranto in southern Italy. From Otranto, it continues onshore for around 160 km to the Taranto area, where it would connect to the Italian Hydrogen Backbone.

The route brings two industrial regions within reach of new hydrogen supplies. Potential users include hard to abate industries in the region and operators serving the port and maritime sector in Igoumenitsa. The connection to the Italian backbone would also open a route to industrial markets in the north of Italy and Central Europe as the network develops.

A choice of hydrogen sources

On the Greek side, H2 Poseidon would carry hydrogen produced in Greece from renewable energy, alongside hydrogen recovered from ammonia shipped to the planned Ionian Energy Terminal. A further source could become available if the EastMed pipeline is converted to carry hydrogen from producers in the Mediterranean and the Middle East.

The pipeline two-way design would allow hydrogen to move towards either market as supply and demand change. Ammonia storage at the Ionian Energy Terminal would add flexibility by allowing operators to adjust hydrogen deliveries between shipments.

Project development

IGI Poseidon next engineering milestone is to complete advanced front-end engineering design (FEED) in preparation for a final investment decision. The company is coordinating its plans with the neighbouring transmission system operators, with 2035 as the target for commercial operation.

The EU lists the offshore interconnection as a Project of Common Interest (PCI 10.7.2) within the Greece–Italy Hydrogen Corridor. H2 Poseidon also features in the last European Ten-Year Network Development Plan project lists and in the 2025–2034 Italian network development plan.

hero image
main image

Ionian Energy Terminal

Opening a new route for hydrogen to Europe

IGI Poseidon is developing the Ionian Energy Terminal to connect international ammonia suppliers with the European emerging hydrogen markets. Located in the Igoumenitsa area of north-western Greece, the project will combine seaborne imports, offshore storage and onshore conversion into hydrogen, creating a new supply gateway for South-Eastern Europe.

Designed for approximately 500,000 tonnes of hydrogen output per year from 2035, the terminal will help bridge the gap between European demand and domestic production. It brings IGI Poseidon commitment to diversified energy sources and routes into the development of the European hydrogen infrastructure.

  • arrow icon Location: Igoumenitsa area, Greece
  • arrow icon Planned hydrogen output: approximately 500,000 tonnes per year
  • arrow icon Target start of operations: 2035
  • arrow icon Development stage: pre-feasibility completed; preliminary FEED activities under way
  • arrow icon European recognition: included in the second EU PCI list and the 2026 TYNDP list

A complete route from ammonia imports to hydrogen supply

The terminal is designed to import green ammonia and convert it back into hydrogen through ammonia cracking.

An offshore facility between Corfu and Igoumenitsa will handle ammonia reception, storage and send-out. An onshore plant will house the cracking process and hydrogen distribution facilities, connecting maritime supply with the future pipeline network.

Integrated storage is central to the design. By holding ammonia before conversion, the terminal will be able to adjust hydrogen deliveries to changes in demand and fluctuations in supply chains.

Global reach, European connections

Seaborne imports will provide access to suppliers across the Middle East and North Africa, the Gulf countries and India. This approach broadens the choice of supply sources without requiring dedicated cross-border pipelines to each producing region.

The terminal is planned to be connected to the future Greek hydrogen grid and, through the H2 Poseidon Pipeline, to Italy’s hydrogen backbone feeding the Greece–Italy Hydrogen Corridor and providing access towards Central European demand centres as the wider network develops.

More choice for a market taking shape

South-Eastern Europe still has limited dedicated hydrogen import infrastructure. The Ionian Energy Terminal will address that gap by opening access to renewable and low-carbon hydrogen supplies from international markets.

A wider range of suppliers and import routes will support competition and security of supply. Its combination of maritime access, ammonia storage and pipeline connections will also give the emerging market greater operational flexibility.

For industries where emissions are particularly difficult to reduce, the terminal will create an additional route to hydrogen supply, supporting industrial decarbonisation and the European path towards climate neutrality by 2050.

Moving the project forward

Pre-feasibility studies have been completed, identifying the preliminary system configuration. Preliminary front-end engineering design (FEED) activities are now under way to further develop the technical design.

The Ionian Energy Terminal is included in the second EU list of Projects of Common Interest (PCIs). It also features in the 2024 Ten-Year Network Development Plan (TYNDP), with inclusion confirmed in the 2026 TYNDP list.

Together with the H2 Poseidon Pipeline, the terminal forms part of IGI Poseidon work to develop the connections needed for a more diversified and integrated European energy system.

hero image
main image

Altri progetti

IGB

Interconnettore Gas Grecia- Bulgaria per l’Europa

Arrow icon Conosci IGB